
Car Charger Before and After
This commercial demolition project was at a TD bank in Surrey to install a new electric car charging port. After a site meeting with the electrician, we came up with a plan that would require the least amount of demolition and disruption to the bank. Installing car charging systems is farily simple as long as the electrical panel will support the load. In this case the panel was sufficient, so it was simply a matter of getting power to the car charger in the parking lot. We were lucky as we did not have to do much interior demolition to get power from the electrical panel to the charger, so most of the work was hand excavation outside!
Leave Us a Google Review
Your feedback keeps us accountable and helps others choose responsibly.
Two Office Locations
Vancouver
Progressive Environmental
1816-68 Smithe St.
Vancouver BC V6B-0P4
Vancouver Island
Progressive Environmental
1-264 Craig St.
Nanaimo, BC. V9R-3V5
Progressive Environmental
Let’s Build a Safer Site Together
From testing to teardown, we’re here to help you move forward with clarity.
Reach out anytime. We’ll walk you through what matters for your site.













